Sign In | Join Free | My autoplansearch.com
China Shenzhen Origin Electronic CO., Ltd logo
Shenzhen Origin Electronic CO., Ltd
Verified Supplier

2 Years

Home > Wireless GPS Tracker >

Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks

Shenzhen Origin Electronic CO., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks

Brand Name : Origin

Model Number : LY-W03

Place of Origin : China

MOQ : 1

Payment Terms : PAYPAL;TT

Supply Ability : 10000/Month

Delivery Time : 4-8 days

Packaging Details : Caton box

Display Type : Color TFT

Bluetooth Compatible : Yes

Speed Limit Indicator : Yes

Lane Assist : Yes

Resolution : 480 x 272 pixels

Maps Included : North America

Storage Capacity : 16 GB

Mounting Type : Suction cup

Screen Size : 5 inches

Trip Planner : Yes

Voice Guidance : Yes

Real-Time Traffic Updates : Yes

Model : Drive 52

Certification : CE & Rohs

Contact Now

Mini - sized and easy to hide. It can be placed in a hidden corner of the asset, unnoticed,

but always guarding the asset's safety. Compatible with a variety of vehicle models.

Whether it's a family car or a large truck, it can be stably adsorbed and function properly for positioning and tracking.

Product Features

  • Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks

    4G Network Support

    Supports domestic 2G/4G networks

  • Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks

    Optical Anti-Tamper

    Built-in optical protection, remains in standby mode for extended periods, triggers platform alert when tampering detected

  • Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks

    WiFi+BeiDou+GPS+LBS Positioning

    Multi-mode positioning: Satellite (GPS+BeiDou) + LBS + WiFi

  • Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks

    Fake Base Station Detection

    Automatically identifies fake base stations and maintains normal communication

Core Features

Specifications

Feature Description
Alarm Mode Maximum 4 daily wake-up times, automatically wakes up and sends location data before hibernation
Timed Mode Regular location data transmission at set intervals
Weekly Mode Schedule specific days/times for data transmission
Multi-mode Positioning Automatic base station positioning when WiFi/GPS unavailable
Serial Port Settings Configurable IP/port, APN, device number, alarm/timed/weekly modes
SMS Settings Configurable via SMS commands
SMS Query Returns current device parameters
Tamper Alert Detects light exposure changes and triggers platform alerts (default enabled)
Anti Fake Base Station Rejects connection to detected fake base stations

Technical Parameters

Item Details
Antenna Built - in GPS ceramic antenna
Built-in LED indicator Positioning light: Yellow, Communication light: Red, Charging light: Blue
Battery 1500mAh lithium battery
1500mAh nickel battery
Working voltage/current 24mA@3.7V (operating)
800uA@3.7V (standby)
Host color Black
Host size L55.4mm * W36.6mm * H20mm
Working temperature -25℃ to +75℃
Storage temperature -40℃ to +85℃
Location module HD8125
Communication module EC718E
G-sensor DA218B
Charging IC SGM41513YTFQ24G
GPS antenna 18182MM
Power IC LP6301AQVF
Power Amplifier IC ES8311

Applications

Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks
Financial Mortgages
Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks
Auto Loans
Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks
Fleet Management
Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks
Asset Tracking
Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks
Cross-border Cargo Tracking (Containers)

Product Tags:

Cars Portable Magnetic GPS Tracker

      

Real Time GPS Location Tracker

      

Real Time GPS Tracker For Trucks

      
Cheap Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks for sale

Real Time Location Monitoring Portable Magnetic GPS Tracker For Cars & Trucks Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shenzhen Origin Electronic CO., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0